Bhilai Warehouse Development
Structural fabrication, bituminous works, drains, high-mast lighting and concrete works for warehouse development.
Key quantities
About this project
Warehouse development works inside Bhilai Steel Plant: structural fabrication and erection, large-area bituminous works, RCC drains, high-mast lighting and concrete works.
Request a QuoteUVA Associates executed civil, structural and electrical-related works for warehouse development at SAIL – Bhilai Steel Plant. Work ran from site formation through to the finished hardstands, drains and lighting.
Scope of work
- Earthwork, sub-base and WMM for roads and hardstand areas
- Bituminous works over the warehouse roads and yards
- RCC drains around the development
- Structural steel fabrication and erection
- High-mast lighting
- RCC and PCC concrete works
Quality checks on site included field density tests on compacted layers and concrete cube testing.
Other projects
Completed
CSIDC Engineering Park Development, Bhilai
Infrastructure works for the CSIDC Engineering Park in Bhilai: bituminous roads, drains, site development, divider painting, street lighting...
Completed
Public Works Department (PWD) Rana Khuji to Renga Dabri Road
A rural road for the Public Works Department: about 8 km of bituminous road built up from subgrade, with 10 km of RCC drains, 20 pipe culver...
Completed
SAIL – Bhilai Steel Plant (Medical Department) Strengthening & Re-plastering of Ward Blocks, JLNH&RC Bhilai
Strengthening and re-plastering of the old ward blocks, isolation ward, OPD block and other units at JLNH&RC Bhilai for the Medical Departme...
Completed
Jal Jeevan Mission, Govt. of Chhattisgarh Jal Jeevan Mission – Water Supply Infrastructure
Water supply works under the Jal Jeevan Mission across 18 villages in the Mohla-Manpur, Kanker and Rajnandgaon divisions: about 8,000 km of...
Completed
SAIL – Bhilai Steel Plant Repair of Differential Settlement, Flyover-2 over CEZ Circle
Execution of work for repair of the differential settlement observed in Flyover-2 over CEZ Circle, Bhilai, Distt-Durg, from May 2024 to Apri...
Completed
SAIL – Bhilai Steel Plant Flyover No. 2 – Balance Civil Works (PKG No. 111-01C)
Balance of civil works for construction of Flyover No. 2 at Bhilai Steel Plant (PKG No. 111-01C), Bhilai, Distt-Durg, from May 2021 to March...