12 projects for government and industry
Works for SAIL / Bhilai Steel Plant, UltraTech Cement, CSIDC, the Public Works Department, CSPDCL and the Jal Jeevan Mission. 9 completed, 2 under execution and 1 starting soon.
Completed
SAIL – Bhilai Steel Plant Bhilai Warehouse Development
Warehouse development works inside Bhilai Steel Plant: structural fabrication and erection, large-area bituminous works, RCC drains, high-ma...
Completed
CSIDC Engineering Park Development, Bhilai
Infrastructure works for the CSIDC Engineering Park in Bhilai: bituminous roads, drains, site development, divider painting, street lighting...
Completed
Public Works Department (PWD) Rana Khuji to Renga Dabri Road
A rural road for the Public Works Department: about 8 km of bituminous road built up from subgrade, with 10 km of RCC drains, 20 pipe culver...
Completed
SAIL – Bhilai Steel Plant (Medical Department) Strengthening & Re-plastering of Ward Blocks, JLNH&RC Bhilai
Strengthening and re-plastering of the old ward blocks, isolation ward, OPD block and other units at JLNH&RC Bhilai for the Medical Departme...
Completed
Jal Jeevan Mission, Govt. of Chhattisgarh Jal Jeevan Mission – Water Supply Infrastructure
Water supply works under the Jal Jeevan Mission across 18 villages in the Mohla-Manpur, Kanker and Rajnandgaon divisions: about 8,000 km of...
Completed
SAIL – Bhilai Steel Plant Repair of Differential Settlement, Flyover-2 over CEZ Circle
Execution of work for repair of the differential settlement observed in Flyover-2 over CEZ Circle, Bhilai, Distt-Durg, from May 2024 to Apri...
Completed
SAIL – Bhilai Steel Plant Flyover No. 2 – Balance Civil Works (PKG No. 111-01C)
Balance of civil works for construction of Flyover No. 2 at Bhilai Steel Plant (PKG No. 111-01C), Bhilai, Distt-Durg, from May 2021 to March...
Completed
UltraTech Cement UltraTech Cement – Labour Colony, Baloda Bazar
Construction of a labourers’ and workers’ department colony for UltraTech Cement at Baloda Bazar, started in January 2023 and completed the...
Completed
CSPDCL Kothitola Dongargarh Substation
Substation works at Kothitola, Dongargarh for CSPDCL: a 3.15 MVA transformer, 16 km of 33 kV line on PCC poles, 33 kV DP and TP structures,...
Ongoing
SAIL – Bhilai Steel Plant Relocation of CMO Warehouse, Disposal Stores and Other Facilities
Relocation of the CMO warehouse, disposal stores and other facilities at Bhilai Steel Plant under Enabling Works Package No. 0 for the Unive...
Ongoing
Bulk Store Shifting to TPL Workshop Area
Shifting of the bulk store to the TPL workshop area, under way since March 2025 and about 60% complete: 5,000 m² of RCC flooring, 100 MT of...
Upcoming
SAIL – Bhilai Steel Plant Road Divider, Sector 9 Hospital Chowk to BSP Main Gate
Construction of the road divider from Sector 9 Hospital Chowk to BSP Main Gate Chowk, Bhilai, about 8 km in length. The tender has been awar...
Project names, scope and quantities are as provided by UVA Associates. Client names are listed for identification of the work executed.