Strengthening & Re-plastering of Ward Blocks, JLNH&RC Bhilai
Strengthening and re-plastering of the old ward blocks, isolation ward, OPD block and other units at JLNH&RC Bhilai.
Key quantities
About this project
Strengthening and re-plastering of the old ward blocks, isolation ward, OPD block and other units at JLNH&RC Bhilai for the Medical Department, Bhilai Steel Plant (2019–2021), with about 10,000 sq m of guniting and plastering and 12,000 sq m of painting.
Request a QuoteStrengthening and re-plastering of the old ward blocks, isolation ward, OPD block and other units at the Jawaharlal Nehru Hospital and Research Centre (JLNH&RC), Bhilai, for the Medical Department of SAIL – Bhilai Steel Plant, carried out from 2019 to 2021. Work was done from full-height scaffolding around the occupied hospital buildings.
Scope of work
- Structural strengthening, including column jacketing
- Guniting and plastering of external surfaces
- Painting works
Other projects
Completed
SAIL – Bhilai Steel Plant Bhilai Warehouse Development
Warehouse development works inside Bhilai Steel Plant: structural fabrication and erection, large-area bituminous works, RCC drains, high-ma...
Completed
CSIDC Engineering Park Development, Bhilai
Infrastructure works for the CSIDC Engineering Park in Bhilai: bituminous roads, drains, site development, divider painting, street lighting...
Completed
Public Works Department (PWD) Rana Khuji to Renga Dabri Road
A rural road for the Public Works Department: about 8 km of bituminous road built up from subgrade, with 10 km of RCC drains, 20 pipe culver...
Completed
Jal Jeevan Mission, Govt. of Chhattisgarh Jal Jeevan Mission – Water Supply Infrastructure
Water supply works under the Jal Jeevan Mission across 18 villages in the Mohla-Manpur, Kanker and Rajnandgaon divisions: about 8,000 km of...
Completed
SAIL – Bhilai Steel Plant Repair of Differential Settlement, Flyover-2 over CEZ Circle
Execution of work for repair of the differential settlement observed in Flyover-2 over CEZ Circle, Bhilai, Distt-Durg, from May 2024 to Apri...
Completed
SAIL – Bhilai Steel Plant Flyover No. 2 – Balance Civil Works (PKG No. 111-01C)
Balance of civil works for construction of Flyover No. 2 at Bhilai Steel Plant (PKG No. 111-01C), Bhilai, Distt-Durg, from May 2021 to March...