UltraTech Cement – Labour Colony, Baloda Bazar
Construction of a labourers’ and workers’ colony at the UltraTech Cement plant, Baloda Bazar.
About this project
Construction of a labourers’ and workers’ department colony for UltraTech Cement at Baloda Bazar, started in January 2023 and completed the same year.
Request a QuoteConstruction of a labourers’ and workers’ department colony for UltraTech Cement at Baloda Bazar, Chhattisgarh. Work started in January 2023 and was completed in 2023.
Other projects
Completed
SAIL – Bhilai Steel Plant Bhilai Warehouse Development
Warehouse development works inside Bhilai Steel Plant: structural fabrication and erection, large-area bituminous works, RCC drains, high-ma...
Completed
CSIDC Engineering Park Development, Bhilai
Infrastructure works for the CSIDC Engineering Park in Bhilai: bituminous roads, drains, site development, divider painting, street lighting...
Completed
Public Works Department (PWD) Rana Khuji to Renga Dabri Road
A rural road for the Public Works Department: about 8 km of bituminous road built up from subgrade, with 10 km of RCC drains, 20 pipe culver...
Completed
SAIL – Bhilai Steel Plant (Medical Department) Strengthening & Re-plastering of Ward Blocks, JLNH&RC Bhilai
Strengthening and re-plastering of the old ward blocks, isolation ward, OPD block and other units at JLNH&RC Bhilai for the Medical Departme...
Completed
Jal Jeevan Mission, Govt. of Chhattisgarh Jal Jeevan Mission – Water Supply Infrastructure
Water supply works under the Jal Jeevan Mission across 18 villages in the Mohla-Manpur, Kanker and Rajnandgaon divisions: about 8,000 km of...
Completed
SAIL – Bhilai Steel Plant Repair of Differential Settlement, Flyover-2 over CEZ Circle
Execution of work for repair of the differential settlement observed in Flyover-2 over CEZ Circle, Bhilai, Distt-Durg, from May 2024 to Apri...