Request a Quote
Language
UVA Associates

UVA Associates is a Bhilai, Chhattisgarh based civil construction and infrastructure contractor, working since 2018 on roads, drainage, industrial civil works, buildings and rehabilitation, structural fabrication, water supply infrastructure and electrical-related civil works for government, industrial and public-sector clients.

GSTIN
22AAHFU8515F1Z9
  1. Home
  2. Projects

Our Projects

Roads, drains, warehouses, hospitals, flyovers, water supply and substation works executed across Chhattisgarh.

Selected works

12 projects for government and industry

Works for SAIL / Bhilai Steel Plant, UltraTech Cement, CSIDC, the Public Works Department, CSPDCL and the Jal Jeevan Mission. 9 completed, 2 under execution and 1 starting soon.

Bhilai Warehouse Development Completed SAIL – Bhilai Steel Plant

Bhilai Warehouse Development

Warehouse development works inside Bhilai Steel Plant: structural fabrication and erection, large-area bituminous works, RCC drains, high-ma...

Industrial Civil Works Bhilai, Chhattisgarh
Engineering Park Development, Bhilai Completed CSIDC

Engineering Park Development, Bhilai

Infrastructure works for the CSIDC Engineering Park in Bhilai: bituminous roads, drains, site development, divider painting, street lighting...

Roads & Pavements Engineering Park, Bhilai
Rana Khuji to Renga Dabri Road Completed Public Works Department (PWD)

Rana Khuji to Renga Dabri Road

A rural road for the Public Works Department: about 8 km of bituminous road built up from subgrade, with 10 km of RCC drains, 20 pipe culver...

Roads & Pavements Rana Khuji, Chhattisgarh
Strengthening & Re-plastering of Ward Blocks, JLNH&RC Bhilai Completed SAIL – Bhilai Steel Plant (Medical Department)

Strengthening & Re-plastering of Ward Blocks, JLNH&RC Bhilai

Strengthening and re-plastering of the old ward blocks, isolation ward, OPD block and other units at JLNH&RC Bhilai for the Medical Departme...

Buildings & Rehabilitation JLNH&RC, Sector 9, Bhilai
Jal Jeevan Mission – Water Supply Infrastructure Completed Jal Jeevan Mission, Govt. of Chhattisgarh

Jal Jeevan Mission – Water Supply Infrastructure

Water supply works under the Jal Jeevan Mission across 18 villages in the Mohla-Manpur, Kanker and Rajnandgaon divisions: about 8,000 km of...

Water Supply Infrastructure Mohla-Manpur, Kanker and Rajnandgaon divisions
Repair of Differential Settlement, Flyover-2 over CEZ Circle Completed SAIL – Bhilai Steel Plant

Repair of Differential Settlement, Flyover-2 over CEZ Circle

Execution of work for repair of the differential settlement observed in Flyover-2 over CEZ Circle, Bhilai, Distt-Durg, from May 2024 to Apri...

Roads & Pavements CEZ Circle, Bhilai, Distt-Durg
Flyover No. 2 – Balance Civil Works (PKG No. 111-01C) Completed SAIL – Bhilai Steel Plant

Flyover No. 2 – Balance Civil Works (PKG No. 111-01C)

Balance of civil works for construction of Flyover No. 2 at Bhilai Steel Plant (PKG No. 111-01C), Bhilai, Distt-Durg, from May 2021 to March...

Roads & Pavements Bhilai, Distt-Durg
UltraTech Cement – Labour Colony, Baloda Bazar Completed UltraTech Cement

UltraTech Cement – Labour Colony, Baloda Bazar

Construction of a labourers’ and workers’ department colony for UltraTech Cement at Baloda Bazar, started in January 2023 and completed the...

Buildings & Rehabilitation Baloda Bazar, Chhattisgarh
Kothitola Dongargarh Substation Completed CSPDCL

Kothitola Dongargarh Substation

Substation works at Kothitola, Dongargarh for CSPDCL: a 3.15 MVA transformer, 16 km of 33 kV line on PCC poles, 33 kV DP and TP structures,...

Electrical & Site Development Kothitola, Dongargarh
Relocation of CMO Warehouse, Disposal Stores and Other Facilities Ongoing SAIL – Bhilai Steel Plant

Relocation of CMO Warehouse, Disposal Stores and Other Facilities

Relocation of the CMO warehouse, disposal stores and other facilities at Bhilai Steel Plant under Enabling Works Package No. 0 for the Unive...

Industrial Civil Works Bhilai Steel Plant
Bulk Store Shifting to TPL Workshop Area Ongoing

Bulk Store Shifting to TPL Workshop Area

Shifting of the bulk store to the TPL workshop area, under way since March 2025 and about 60% complete: 5,000 m² of RCC flooring, 100 MT of...

Industrial Civil Works
Road Divider, Sector 9 Hospital Chowk to BSP Main Gate Upcoming SAIL – Bhilai Steel Plant

Road Divider, Sector 9 Hospital Chowk to BSP Main Gate

Construction of the road divider from Sector 9 Hospital Chowk to BSP Main Gate Chowk, Bhilai, about 8 km in length. The tender has been awar...

Roads & Pavements Bhilai, Chhattisgarh

Project names, scope and quantities are as provided by UVA Associates. Client names are listed for identification of the work executed.

Have a similar project?

Let's talk

Share the scope, site location and timeline. Our team will get back to you to discuss the work.

Request a Quote

Tell us about your project

Choose the type of work, share the site location and scope, and leave your number. Our team will get back to you to discuss the requirement.

What happens next
  • We call you back within working hours to understand the scope and schedule.
  • Share drawings, BOQ or tender documents by email for a detailed quotation.
  • Site visit where needed, across Bhilai, Durg, Raipur and Chhattisgarh.
  1. 1Service
  2. 2Project
  3. 3Your details
What kind of work is it?

Planning a road, building or industrial project?

Share the scope, location and timeline. Our team will get back to you with next steps and a quotation.